: | |
---|---|
Menge: | |
Double stack screw suction purification truck, chassis configuration: Dongfeng Dorika Euro6 Yuchai 165 horsepower chassis, daytime driving lights, central control lock, electric doors and Windows, abs, air brake, air conditioning, double girder, top equipment configuration: 3cbm stainless steel water tank, high pressure pump Pfu 215 flow, authentic 402 double axis stack screw machine, 50kw generator set, 11kw Vakuumpumpe der Wasserzyklus, P4 -Abwasserpumpe, LED -Werbebildschirm, 60 m Hochdruckrohr, 24 m Saugrohr, 10 Standard -Sprinkler, Dosierpumpe aus Edelstahl, Abwassertank aus Edelstahl, Mischtank aus Edelstahl.
Verarbeitungsgeschwindigkeit pro Stunde: sauberes Wasser und Bio -Dünger 18 bis 25 Quadrate, direkt gepumpt geradereihestreihe 60 bis 100 Quadrate.
Double stack screw suction purification truck, chassis configuration: Dongfeng Dorika Euro6 Yuchai 165 horsepower chassis, daytime driving lights, central control lock, electric doors and Windows, abs, air brake, air conditioning, double girder, top equipment configuration: 3cbm stainless steel water tank, high pressure pump Pfu 215 flow, authentic 402 double axis stack screw machine, 50kw generator set, 11kw Vakuumpumpe der Wasserzyklus, P4 -Abwasserpumpe, LED -Werbebildschirm, 60 m Hochdruckrohr, 24 m Saugrohr, 10 Standard -Sprinkler, Dosierpumpe aus Edelstahl, Abwassertank aus Edelstahl, Mischtank aus Edelstahl.
Verarbeitungsgeschwindigkeit pro Stunde: sauberes Wasser und Bio -Dünger 18 bis 25 Quadrate, direkt gepumpt geradereihestreihe 60 bis 100 Quadrate.