infhaighteacht íonú séarachais: | |
---|---|
Cainníocht: | |
Double stack screw suction purification truck, chassis configuration: Dongfeng Dorika Euro6 Yuchai 165 horsepower chassis, daytime driving lights, central control lock, electric doors and Windows, abs, air brake, air conditioning, double girder, top equipment configuration: 3cbm stainless steel water tank, high pressure pump Pfu 215 flow, authentic 402 double axis stack screw machine, 50kw generator set, 11kW caidéal folúis timthrialla uisce, caidéal séarachais P4, scáileán fógraíochta LED, píopa brú ard 60m, píopa shúchán 24m, 10 sprinklers caighdeánach, caidéal dosing cruach dhosmálta, umar séarachais cruach dhosmálta, umar measctha cruach dhosmálta.
Luas próiseála in aghaidh na huaire: uisce glan agus leasachán orgánach 18 go 25 cearnóga, a phumpáil go díreach as a chéile 60 go 100 cearnóga.
Double stack screw suction purification truck, chassis configuration: Dongfeng Dorika Euro6 Yuchai 165 horsepower chassis, daytime driving lights, central control lock, electric doors and Windows, abs, air brake, air conditioning, double girder, top equipment configuration: 3cbm stainless steel water tank, high pressure pump Pfu 215 flow, authentic 402 double axis stack screw machine, 50kw generator set, 11kW caidéal folúis timthrialla uisce, caidéal séarachais P4, scáileán fógraíochta LED, píopa brú ard 60m, píopa shúchán 24m, 10 sprinklers caighdeánach, caidéal dosing cruach dhosmálta, umar séarachais cruach dhosmálta, umar measctha cruach dhosmálta.
Luas próiseála in aghaidh na huaire: uisce glan agus leasachán orgánach 18 go 25 cearnóga, a phumpáil go díreach as a chéile 60 go 100 cearnóga.